Mrp subcontracting bom dual use
mrp_subcontracting_bom_dual_use
Tecnativa
14.0 / 16.0
14
0.00 € 0.0 EUR
Inhibit subcontracting flow on demand
mrp_subcontracting_inhibit
Tecnativa
14.0 / 16.0
3
0.00 € 0.0 EUR
MRP Serial Number Propagation
mrp_lot_number_propagation
Camptocamp
15.0 / 16.0
12
0.00 € 0.0 EUR
Export Flattened BOM to Excel with direct materials cost
mrp_flattened_bom_xlsx_direct_materials_cost
ForgeFlow
13.0 / 14.0 / 16.0
3
0.00 € 0.0 EUR
Export Flattened BOM to Excel with labour cost
mrp_flattened_bom_xlsx_labour_cost
ForgeFlow
14.0 / 16.0
1
0.00 € 0.0 EUR
Export Flattened BOM to Excel with subcontracting cost
mrp_flattened_bom_xlsx_subcontracting_cost
ForgeFlow
14.0 / 16.0
1
0.00 € 0.0 EUR
MRP Default Workorder Time
mrp_default_workorder_time
ForgeFlow
16.0
0
0.00 € 0.0 EUR
MRP Subcontracting Skip No Negative
mrp_subcontracting_skip_no_negative
Quartile Limited
16.0
0
0.00 € 0.0 EUR
MRP BoM Line formula for quantity
mrp_bom_line_formula_quantity
Aion Tech
16.0
2
0.00 € 0.0 EUR
MRP Workorder Lot Display
mrp_workorder_lot_display
Camptocamp
15.0 / 16.0
7
0.00 € 0.0 EUR
MRP Lot Production Date
mrp_lot_production_date
Camptocamp
14.0 / 16.0
0
0.00 € 0.0 EUR
Repair Security
repair_security
ForgeFlow S.L.
15.0 / 16.0
0
0.00 € 0.0 EUR