MRP Project Link (with operations)
Create task for work orders with operators
MRP Project Link (with operations)
This module links manufacturing operations with projects. It performs the following actions:
- Auto-create tasks for work orders with assigned operators.
- Add a tab where to encode task for the work order.
- Add a link on task for the work order scheduled product.
Installation
This modules is auto-installed when you install mrp_operations_extension and mrp_project.
Usage
In a manufacturing order (MO) containing work orders with at least one operator assigned, when a work order is started, a task is created and assigned to the operator.
In the work order form, a new tab "Operators time" is added to input the the work log.
Besides, in the related tasks, the products scheduled in the work order are listed.
Bug Tracker
Bugs are tracked on GitHub Issues. In case of trouble, please check there if your issue has already been reported. If you spotted it first, help us smashing it by providing a detailed and welcomed feedback.
Credits
Contributors
- Daniel Campos <danielcampos@avanzosc.es>
- Pedro M. Baeza <pedro.baeza@serviciosbaeza.com>
Images
- Original Odoo icons.
- Thanks to https://openclipart.org/detail/15193/Arrow set %28Comic%29
- Thanks to https://openclipart.org/detail/151831/work-bench
Maintainer
This module is maintained by the OCA.
OCA, or the Odoo Community Association, is a nonprofit organization whose mission is to support the collaborative development of Odoo features and promote its widespread use.
To contribute to this module, please visit https://odoo-community.org.
Once the user has seen at least one product this snippet will be visible.