Hi,

Back in the days (in v8.0), there was OdooMRP initiative to calculate the cost of production and the corresponding AA in order to get a PL for the specific MO or product.

I checked current v10.0 or v11.0 branch and could not see anything similar: is there anything valuable I could use as a start for this kind of requirement?


Target is v11.0.

Objective is to calculate the cost of finished goods based on actual raw material consumption, including sub-contracting services (mrp_production_service). I do not need the manpower in my particular case because this is subcontracting but we should consider extensions.


I see 2 outputs:

* Cost to be updated in the finished product

* AA lines created with the corresponding concepts


Thanks for your help

--
Eric Caudal [Founder and CEO]
Skype: elico.corp. Phone: + 86 186 2136 1670 (Cell), + 86 21 6211 8017/27/37 (Office)
Elico Shanghai (Hong Kong/Shenzhen/Singapore)
Odoo Gold Partner // Best Odoo Partner APAC 2014 and 2016